杯口柱基计算书
项目名称_____________日 期_____________
设 计 者_____________校 对 者_____________
一、示意图
基础类型:杯口柱基 计算形式:程序自动计算
平面:
剖面:
二、基本参数
1.依据规范
《建筑地基基础设计规范》(GB 50007-2002)
《混凝土结构设计规范》(GB 50010-2002)
《简明高层钢筋混凝土结构设计手册(第二版)》
2.几何参数:
自动计算所得尺寸:
B1 = 1550 mm, A1 = 1550 mm
H1 = 200 mm, H2 = 350 mm
H3 = 550 mm, H4 = 200 mm
B = 1200 mm, A = 500 mm
杯壁厚度 t = 350 mm
变阶处截面尺寸: B3 = B+2(t+75) = 1200+2(350+75) = 2050 mm
A3 = A+2(t+75) = 500+2(350+75) = 1350 mm
无偏心:
B2 = 1550 mm, A2 = 1550 mm
基础埋深d = 1.80 m
钢筋合力重心到板底距离as = 80 mm
3.荷载值:
(1)作用在基础顶部的基本组合荷载
F = 1023.60 kN
Mx = 0.00 kN·m
My = 711.98 kN·m
Vx = 0.00 kN
Vy = 50.84 kN
折减系数Ks = 1.35
(2)作用在基础底部的弯矩设计值
绕X轴弯矩: M0x = Mx-Vy·(H1+H2+H3) = 0.00-50.84×1.10 = -55.92 kN·m
绕Y轴弯矩: M0y = My+Vx·(H1+H2+H3) = 711.98+0.00×1.10 = 711.98 kN·m
(3)作用在基础底部的弯矩标准值
绕X轴弯矩: M0xk = M0x/Ks = -55.92/1.35 = -41.43 kN·m
绕Y轴弯矩: M0yk = M0y/Ks = 711.98/1.35 = 527.39 kN·m
4.材料信息:
混凝土: C15 钢筋: HPB235(Q235)
5.基础几何特性:
底面积:S = (A1+A2)(B1+B2) = 3.10×3.10 = 9.61 m2
绕X轴抵抗矩:Wx = (1/6)(B1+B2)(A1+A2)2 = (1/6)×3.10×3.102 = 4.97 m3
绕Y轴抵抗矩:Wy = (1/6)(A1+A2)(B1+B2)2 = (1/6)×3.10×3.102 = 4.97 m3
三、计算过程
1.修正地基承载力
修正后的地基承载力特征值 fa = 220.00 kPa
2.轴心荷载作用下地基承载力验算
计算公式:
按《建筑地基基础设计规范》(GB 50007-2002)下列公式验算:
pk = (Fk+Gk)/A (5.2.2-1)
Fk = F/Ks = 1023.60/1.35 = 758.22 kN
Gk = 20S·d = 20×9.61×1.80 = 345.96 kN
pk = (Fk+Gk)/S = (758.22+345.96)/9.61 = 114.90 kPa ≤ fa,满足要求。
3.偏心荷载作用下地基承载力验算
计算公式:
按《建筑地基基础设计规范》(GB 50007-2002)下列公式验算:
当e≤b/6时,pkmax = (Fk+Gk)/A+Mk/W (5.2.2-2)
pkmin = (Fk+Gk)/A-Mk/W (5.2.2-3)
当e>b/6时,pkmax = 2(Fk+Gk)/3la (5.2.2-4)
X、Y方向同时受弯。
偏心距exk = M0yk/(Fk+Gk) = 527.39/(758.22+345.96) = 0.48 m
e = exk = 0.48 m ≤ (B1+B2)/6 = 3.10/6 = 0.52 m
pkmaxX = (Fk+Gk)/S+M0yk/Wy
= (758.22+345.96)/9.61+527.39/4.97 = 221.12 kPa
偏心距eyk = M0xk/(Fk+Gk) = 41.43/(758.22+345.96) = 0.04 m
e = eyk = 0.04 m ≤ (A1+A2)/6 = 3.10/6 = 0.52 m
pkmaxY = (Fk+Gk)/S+M0xk/Wx
= (758.22+345.96)/9.61+41.43/4.97 = 123.24 kPa
pkmax = pkmaxX+pkmaxY-(Fk+Gk)/S = 221.12+123.24-114.90 = 229.46 kPa
≤ 1.2×fa = 1.2×220.00 = 264.00 kPa,满足要求。
4.基础抗冲切验算
计算公式:
按《建筑地基基础设计规范》(GB 50007-2002)下列公式验算:
Fl ≤ 0.7·βhp·ft·am·h0 (8.2.7-1)
Fl = pj·Al (8.2.7-3)
am = (at+ab)/2 (8.2.7-2)
pjmax,x = F/S+M0y/Wy = 1023.60/9.61+711.98/4.97 = 249.91 kPa
pjmin,x = F/S-M0y/Wy = 1023.60/9.61-711.98/4.97≤0, pjmin.x = 0.00 kPa
pjmax,y = F/S+M0x/Wx = 1023.60/9.61+55.92/4.97 = 117.78 kPa
pjmin,y = F/S-M0x/Wx = 1023.60/9.61-55.92/4.97 = 95.25 kPa
pj = pjmax,x+pjmax,y-F/S = 249.91+117.78-106.51 = 261.17 kPa
(1)柱对基础的冲切验算:
H0 = H1+H2-as = 0.20+0.35-0.08 = 0.47 m
X方向:
Alx = 1/4·(2A3+2H0+B1+B2-B3)(B1+B2-B3-2H0)
= (1/4)×(2×1.35+2×0.47+3.10-2.05)(3.10-2.05-2×0.47)
= 0.13 m2
Flx = pj·Alx = 261.17×0.13 = 33.68 kN
ab = min{A3+2H0, A1+A2} = min{1.35+2×0.47, 3.10} = 2.29 m
amx = (at+ab)/2 = (A3+ab)/2 = (1.35+2.29)/2 = 1.82 m
Flx ≤ 0.7·βhp·ft·amx·H0 = 0.7×1.00×910.00×1.820×0.470
= 544.89 kN,满足要求。
Y方向:
Aly = 1/2·(B1+B2)(A1+A2-A3-2H0)-1/4·(B1+B2-B3-2H0)2
= (1/2)×3.10×(3.10-1.35-2×0.47)-(1/4)×(3.10-2.05-2×0.47)2
= 1.25 m2
Fly = pj·Aly = 261.17×1.25 = 327.11 kN
ab = min{B3+2H0, B1+B2} = min{2.05+2×0.47, 3.10} = 2.99 m
amy = (at+ab)/2 = (B3+ab)/2 = (2.05+2.99)/2 = 2.52 m
Fly ≤ 0.7·βhp·ft·amy·H0 = 0.7×1.00×910.00×2.520×0.470
= 754.46 kN,满足要求。
5.基础受弯计算
计算公式:
按《简明高层钢筋混凝土结构设计手册(第二版)》中下列公式验算:
MⅠ=β/48·(L-a)2(2B+b)(pjmax+pjnx) (11.4-7)
MⅡ=β/48·(B-b)2(2L+a)(pjmax+pjny) (11.4-8)
(1)变阶处受弯计算:
Ⅰ-Ⅰ截面处弯矩设计值:
pjnx = pjmin,x+(pjmax,x-pjmin,x)(B1+B2+B3)/2/(B1+B2)
= 0.00+(249.91-0.00)×(3.10+2.05)/2/3.10
= 207.59 kPa
MⅠ = β/48·(B1+B2-B3)2[2(A1+A2)+A3](pjmax,x+pjnx)
= 1.0345/48×(3.10-2.05)2×(2×3.10+1.35)×(249.91+207.59)
= 82.07 kN·m
Ⅱ-Ⅱ截面处弯矩设计值:
pjny = pjmin,y+(pjmax,y-pjmin,y)(A1+A2+A3)/2/(A1+A2)
= 95.25+(117.78-95.25)×(3.10+1.35)/2/3.10
= 111.42 kPa
MⅡ = β/48·(A1+A2-A3)2[2(B1+B2)+B3](pjmax,y+pjny)
= 1.0000/48×(3.10-1.35)2×(2×3.10+2.05)×(117.78+111.42)
= 120.64 kN·m
Ⅰ-Ⅰ截面受弯计算:
相对受压区高度: ζ= 0.016787 配筋率: ρ= 0.000576
ρ < ρmin = 0.001500 ρ = ρmin = 0.001500
计算面积:825.00 mm2/m
Ⅱ-Ⅱ截面受弯计算:
相对受压区高度: ζ= 0.024775 配筋率: ρ= 0.000849
ρ < ρmin = 0.001500 ρ = ρmin = 0.001500
计算面积:825.00 mm2/m
四、计算结果
1.X方向弯矩计算结果:
计算面积:825.00 mm2/m
采用方案:d12@130
实配面积:869.98 mm2/m
2.Y方向弯矩计算结果:
计算面积:825.00 mm2/m
采用方案:d12@130
实配面积:869.98 mm2/m
因篇幅问题不能全部显示,请点此查看更多更全内容